Installing Hardwood Floors On Slab
With the floor prepped spread flooring adhesive with trowel spreading enough to work on a few rows at time so the glue doesn t dry.
Installing hardwood floors on slab. Hardwood type there is no way to install standard 3 4 hardwood on concrete. Installing a nail down engineered hardwood floor step 1. It will extend up the wall for about 2 to 3 inches creating a bowl where your wood floor stays dry and protected.
Add moisture barrier once the slab is dry cover it with a moisture barrier consisting of two layers of tar. It s essential to choose the best option from the available types of floors for your hardwood. Watch this video to see how easy it is.
Can i install hardwood floors on a slab. Things you ll need step 1. Do not fasten and leave 3 4 of an inch of space between the wall and plywood.
Your best option is engineered hardwood flooring. Plywood panels should be set down with 1 8 inch gaps between sheets. Glue will typically set in about 60 minutes hold your trowel at a 45 degree angle spread the glue in small sections.
New concrete is heavy with moisture so test for dryness before beginning the subfloor. This will result in buckling. Next lay the first row.
Nail down the first row for your first row face the tongue toward the center of the room pre drilling and nailing with finishing nails about 1 inch in from the wall. For best results several areas of each room should be tested for excess moisture. First position the plywood layer with its edges parallel to the wall.